In Neckargerach, the decommissioning of the old wastewater treatment plant required the construction of an almost 9 km long pressure pipeline to the Obrigheim wastewater treatment plant. egeplast egeSmart:Integrity DCS pipes were used to implement this demanding project.

Project description

Construction of a wastewater pressure pipeline between the Neckargerach and Obrigheim wastewater treatment plants

Challenges

Safe transport of wastewater through a drinking water protection zone II+III as well as a floodplain; siphon crossing of the River Neckar

Solution

Fully monitored egeSmart:Integrity DCS pipes + DCS pigging stations

Installation

Open-cut construction and flush drilling method

Pipe system

egeSmart:Integrity DCS

Project participants

Client: Municipality of Neckargerach
Design: SAG Ingenieure
Installation: HLT Baugesellschaft Neckargerach

Fully monitored through drinking water protection zones

As continued operation of the wastewater treatment plant in Neckargerach would only have been possible in the long term after extensive structural measures, it was decided to connect the Municipality of Neckargerach to the Obrigheim wastewater treatment plant. A demanding project, the core of which was the construction of a wastewater pressure pipeline between the two wastewater treatment plants. The particular challenge: the pressure pipeline had to be installed through a floodplain along the River Neckar as well as through drinking water protection zones II+III (approx. 500 m).

The commissioned design office SAG Ingenieure from Ulm relied on fully monitored egeplast egeSmart:Integrity DCS pipes for the safe diversion of the wastewater, which were professionally installed by HLT Bau GmbH. The intelligent early warning system of these pipes offers two decisive advantages here: firstly, the permanent leak monitoring allows documentation of damage-free installation; secondly, potential damage can be detected and rectified at an early stage during the construction phase. This ensures safe wastewater disposal in the long term.

This is particularly important because installation was complex due to the special conditions along the route. In addition to open-cut construction for most of the route, flush drilling was carried out on a total of seven sections in order to route the pressure pipeline beneath various bodies of water. Due to the challenging geology of these sections, checking for possible damage during pull-in offered a major advantage. This is because damage can be repaired cost-effectively, quickly and easily in this way. In addition, thanks to this technology, damage to agricultural land is avoided not only during the construction phase but also permanently, as the system enables long-term monitoring and safe wastewater disposal.

Maintenance & cleaning

For easy maintenance and cleaning of the pipeline during operation, various egeSmart:Integrity DCS pigging stations operable from ground level were installed. They are operator-friendly, fast, clean, operable from ground level and ensure cleaning of the pipeline during operation. This keeps the pipeline flow unimpaired and makes it economical to operate from the outset and on a permanent basis.

Your Contact
Kilian Eberle
Technical Field Service for German-speaking Switzerland

egeplast egeMDR socket pressure pipe system in 3R

Read more

A-Nord: Main Artery of the Energy Transition

Read more
Unlock All Downloads
Thank you for your interest! Please complete the fields to instantly access this and all future downloads from our site.