You can contact us
Technical Service and Comprehensive Consulting

Service for
Contractors

egeplast provides contractors with individual consulting and technical support – in every construction phase.

Insights directly from
the construction site

You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information
Based on our excellent experience with egeplast in Amprion projects in recent years, we are delighted to be able to continue our trusting and cooperative partnership in the A-Nord project.

Manuel Schneidereit,
Technical Director A-Nord NRW

Innovative Joining Techniques

Butt Fusion Welding

In this process, the pipe ends are first faced at right angles and then uniformly heated with a heated tool (heating element). After removing the heating element, the pipe ends are pressed together under defined pressure. This creates a material-bonded, permanently tight connection. The procedure is carried out in accordance with DVS guideline 2207 and is particularly suitable for larger pipe diameters and straight connections.

Electrofusion Welding

This method uses fittings with integrated heating wires (heating coils). By applying electric current, the heating coils heat up, causing the contact surfaces between pipe and fitting to melt in a targeted manner. After cooling, a homogeneous, secure connection is formed. This technique is particularly advantageous in confined installation situations, for repairs, and for smaller pipe dimensions, as it offers simple handling and high processing reliability.

Always at Your Side – Even Directly On-Site

Every construction site brings its own challenges: unexpected soil conditions, tight schedules, difficult installation situations, or unclear specifications. In such moments, what counts is a partner who not only delivers, but thinks along and lends a hand.

On-Site Support: With technical instruction at the start of construction as well as welding machine service and rental. Whether clamping inserts for multi-layer pipe systems, modern CNC-controlled electrofusion welding machines, or equipment for PE pipe systems such as internal and external bead removers – customers can rent the appropriate equipment from egeplast to suit their project.

Construction Site Support

Upon request, egeplast offers both initial instruction at the start of construction and official project acceptance upon completion of the work. For specific problems, we provide short-term assistance, either digitally or in person depending on the situation. Even after construction is complete, the service team remains available. In suspected cases, leak detection is carried out or supported, and maintenance of existing monitoring technology is performed during ongoing operation.

Welding Machine Service and Rental

Another part of the egeplast service offering is our comprehensive welding machine fleet.

Personal Consulting

From joint requirements analysis for selecting the appropriate pipe systems, to information and consulting on possible installation options, through to static calculations and the design of pipelines with regard to hydraulic capacities and pressure loss calculations – we are happy to advise you!

Web Calculator 2.0

Fast cost comparisons for easier planning

Calculate project costs, compare construction, material and installation costs and plan individual projects

User-friendly and mobile-compatible
Enables detailed calculation of individual sections
Always up-to-date data and options
Web Calculator

Seminars & Webinars for Contractors

In our seminars and webinars, we provide practical knowledge. From detailed training on our pipe systems and installation methods to current industry challenges. Are you interested in additional topics? Contact us!
To the Seminars & Webinars
Unlock All Downloads
Thank you for your interest! Please complete the fields to instantly access this and all future downloads from our site.