From Practical Experience
Blog & egeNews
Whether an inner-city renovation project or a large international construction site: Our pipe systems are used worldwide and have proven themselves under the most diverse conditions. Here we present specific applications, technical challenges, and customized solutions – directly from practical experience.
Filter

Suedlink: TransnetBW Again Opts for egeplast Power Protect
TransnetBW has awarded further lots for the construction of the SuedLink underground cable route. Here too, the underground cables will be protected by the egeplast Power Protect PE-RT system – in addition to the ongoing deliveries for lots 9 and 10.

Industrial Collector Ensures Wastewater Disposal for Dresden’s Growing Semiconductor Industry
The approximately 10 km long North Industrial Collector (ISN) in Dresden creates the necessary wastewater infrastructure for the expanding semiconductor industry.

Environmentally friendly rehabilitation of drinking water pipelines in Münster – with high Installation speed through the nature reserve
The transport of drinking water from the waterworks in Münster is now carried out by fully welded egeplast pipe systems.

Monitored Irrigation System in Verona
To enable more efficient long-term use of the valuable resource water, the Consorzio di Bonifica Veronese decided to construct an irrigation system for agricultural purposes.

egeplast Power Protect Pipes Protect New High-Voltage Cable from Bayernwerk
The new high-voltage line, an approximately seven-kilometer-long underground cable, is protected by the egeplast Power Protect cable protection pipe system, which was partially installed using horizontal directional drilling and plowing methods.

Secure Wastewater Pipe for Industrial Development in East Brandenburg
The construction of a wastewater transport pipeline for the discharge of wastewater from a newly established industrial plant via a pumping station into an adjacent sewage treatment plant presented all parties involved with major challenges.

Efficient and Sustainable Pipe Rehabilitation through the Installation of Pre-Shaped Pipes Using the Close-Fit Method
The close-fit method with pre-shaped PE pipes is a highly efficient and sustainable pipe rehabilitation method for old drinking water pipes.

Roth: New Drinking Water Interconnection Line
Stadtwerke Roth has begun the Installation of a new drinking water network pipeline from the Roth waterworks to secure the drinking water supply in the long term.

Professional Handling of a Major Project Using the A-Nord Example – Underground Cable Route Currently in Full Operation
The professional handling of major projects is becoming increasingly important given the large number of underground cable projects running simultaneously in the direct current sector.

BorWin4 & DolWin4 – South Section: Expansion of the Green Power Grid is Progressing
In the southern Emsland region, the expansion of the green power grid is entering a significant phase with the grid connection to BorWin4 & DolWin 4.