TransnetBW has awarded further lots for the construction of the SuedLink underground cable route. Here too, the underground cables will be protected by the egeplast Power Protect PE-RT system – in addition to the ongoing deliveries for lots 9 and 10.

Three further Lots for the Construction of the Suedlink Underground Cable Route Awarded to egeplast

On the occasion of the symbolic handover of the new contract, a delegation from TransnetBW visited the egeplast headquarters in Greven. On site, the guests gained an impression of the production of various pipe types and fittings.

Delegation from TransnetBW visiting the headquarters
in Greven (from left to right): Wolfgang Kuhn (TransnetBW), Ralf Utsch (egeplast), Dr. Ansgar Strumann (egeplast), Alexander Cosse (egeplast), Michael Jürgens (TransnetBW), Jürgen Kucklinski
(TransnetBW), Theresa Nerlich (TransnetBW), Heiner Dokters (egeplast), Michael Große Hokamp (egeplast)

Good atmosphere at the symbolic contract handover at the egeplast site: Jürgen Kucklinski (TransnetBW) and Heiner Dokters (egeplast) (from left)
egeplast
Power Protect PE
Protective pipes for high and extra-high voltage cables with a low-friction inner layer and individual marking.
UV-resistant signal color layer
Solid wall or co-extruded, optionally with stripes
Inspection-friendly inner layer: optionally highly slidable or abrasion-resistant
Learn more


