References about
Disposal

Secure Wastewater Pipe for Industrial Development in East Brandenburg
The construction of a wastewater transport pipeline for the discharge of wastewater from a newly established industrial plant via a pumping station into an adjacent sewage treatment plant presented all parties involved with major challenges.

Leakage-monitored Wastewater Pressure Pipeline at the Söse Dam
The new leakage-monitored wastewater pressure pipeline at the Söse Dam, intended to replace the old asbestos cement pipe, had to be routed through drinking water protection zones of classes I and II.

Prague: Integrity Test after Crossing under the Vltava River
For the connection to the central wastewater treatment plant on the Vltava island of Císařský in Prague, a pipeline was installed under the Vltava using the HDD method. Tight bending radii made pipe installation difficult, and the geological conditions were unstable due to the slate rock.

City of Greven Constructs 4th Treatment Stage for Wastewater Treatment Plant
To improve the purification process and eliminate micropollutants in the wastewater stream, the City of Greven decided to construct an additional 4th treatment stage for its wastewater treatment plant, with an estimated investment requirement of 4.5 million Euros.

Neuer Düker unter dem Oder-Havel-Kanal in Oranienburg
Zur Sicherstellung der Ver- und Entsorgung des Oranienburger Stadtteils Lehnitz, einer sich stark entwickelnden Kreisstadt nördlich von Berlin, unterquerten die Stadtwerke den Oder-Havel-Kanal mit gleich zehn Leitungen.