When installing new supply lines for drinking water and gas in Koblenz, Energieversorgung Mittelrhein AG opted for siphon lines under the Rhine. The SLM® 3.0 protective layer pipe system was pulled in using the HDD flushing drilling method.

During the drilling work, the pipe string to be pulled in was pre-welded using the butt fusion method. The SLM® 3.0 protective layer pipe system for damage-free installation can be welded in accordance with DVS without cutting back the jacket. Due to space constraints, one pipe string had to be introduced into the bore channel in a 270° arc with a radius of approx. 30 m. Such tight bending radii are only possible thanks to the high flexibility of the PE material.
After completion of the work, all pressure tests were carried out successfully. Thanks to excellent construction planning and the exceptionally good cooperation of all companies involved in the project, the targeted schedule and budget could be met.
Project data
Project description
Three new siphon lines under the Rhine for drinking water and gas supply
Challenges
Difficult soil conditions prevail under the Rhine, and small bending radii had to be taken into account. In addition, the pull-in took place in a drinking water protection area.
Solution
Trenchless pipe pull-in using the HDD flushing drilling method with a protective layer pipe system made of polyethylene
Installation
HDD flushing drilling method
Pipe system
egeplast SLM® 3.0
OD 355 mm SDR 11 for drinking water; 420 m
OD 355 mm SDR 11 for gas; 420 m
OD 225 mm for gas; 395 m
Project participants
Client: Energienetze Mittelrhein GmbH & Co.KG
Planning: Moll prd, Schmallenberg
HDD drilling: LMR Drilling GmbH, Oldenburg
Welding: Hubert Niederländer GmbH, St. Ingbert