For the new installation of supply lines for drinking water and gas in Koblenz, Energieversorgung Mittelrhein AG opted for pipeline crossing lines under the Rhine. The SLM® 3.0 protective casing pipe system was installed using the HDD method.

During drilling, the pipe string to be installed was pre-welded using the butt welding method. The SLM® 3.0 protective casing pipe system for damage-free installation can be welded without casing cut-back according to DVS. Due to space constraints, a pipe string had to be inserted into the bore channel in a 270° bend with a radius of approx. 30 m. Such tight bending radii are only possible due to the high flexibility of the PE material.
After completion of the work, all pressure tests were successfully carried out. Due to excellent construction planning and the exceptionally good cooperation of all companies involved in the project, the targeted time and cost schedule could be met.
Project Data
Project description
Three New Pipeline Crossing Lines under the Rhine for Drinking Water and Gas Supply
Challenges
Challenging ground conditions exist under the Rhine, and small bending radii had to be considered. Furthermore, installation took place in a drinking water protection area.
Solution
Trenchless Pipe Installation using the HDD Method with a Polyethylene Protective Casing Pipe System
Installation
HDD Method
Pipe system
egeplast SLM® 3.0
OD 355 mm SDR 11 for drinking water; 420 m
OD 355 mm SDR 11 for gas; 420 m
OD 225 mm for gas; 395 m
Project participants
Client: Energienetze Mittelrhein GmbH & Co.KG
Planning: Moll prd, Schmallenberg
HDD Drilling: LMR Drilling GmbH, Oldenburg
Welding: Hubert Niederländer GmbH, St. Ingbert