To ensure the drinking water supply for the 14,000 residents of Stavanger’s Hundvåg district, the rehabilitation of the main water supply became necessary. The city administration opted for the diffusion-tight egeplast SLA
Challenging Ground Conditions
The main water pipeline runs from Stavanger city center to the Hundvåg district. For the rehabilitation, the pipeline – starting at the inlet structure on the quay in the west – was connected to the existing underwater pipeline of the city of Stavanger and then continued along Ulsnesveien. With the final 708 m, this important rehabilitation measure was completed with this section.

Requirement: Diffusion-tight Pipes
As diffusion-tight pipes are required by the city administration for projects in a defined area below sea level, the egeplast SLA® Barrier Pipe was chosen for this project as well. This pipe has been used by the city of Stavanger for many years and has proven its worth in various projects. To ensure a smooth process and optimal Installation, close cooperation with egeplast was established.
Kine Homleid Johansen, Project Manager in the municipality of Stavanger, appreciates the high quality of the training courses and the service provided by egeplast: “The constant exchange and close cooperation in all project phases give us a sense of security in the joint projects. We thank you for the good cooperation and would work with egeplast again at any time.”



egeplast
SLA® Barrier Pipe System
Permeation-resistant to protect drinking water and the environment
additive protective layer
certified barrier layer made of aluminum
Core pipe made of PE 100-RC
Learn moreProject description
Rehabilitation of the Main Water Supply
Challenges
Challenging ground conditions with remnants of walls and buildings
Solution
Flexible Solution: As Installation using the burstlining method could not be performed, the Open Trench Installation method was utilized.
Installation
Open Trench Installation
Pipe system
egeplast SLA® Barrier Pipe OD 560 mm, SDR 11, 708 m in lengths of 13.4 m
Project participants
Client: Stavanger municipality, Burstlining Company: Steg Entreprenør AS, Construction Company: Nordbø Maskin AS