To ensure the drinking water supply for the 14,000 residents of Stavanger’s Hundvåg district, the rehabilitation of the main water supply became necessary. The city administration opted for the diffusion-tight egeplast SLA® Barrier Pipe. Although the Installation was initially planned using the burstlining method through an existing cast iron pipe, a change to Open Trench Installation was required.
Challenging Ground Conditions
The main water pipeline runs from Stavanger city center to the Hundvåg district. For the rehabilitation, the pipeline – starting at the inlet structure on the quay in the west – was connected to the existing underwater pipeline of the city of Stavanger and then continued along Ulsnesveien. With the final 708 m, this important rehabilitation measure was completed with this section.

Requirement: Diffusion-tight Pipes
Since the city administration requires diffusion-tight pipes for projects in a defined area below sea level, it was decided here too to use the egeplast SLA® Barrier Pipe, which has been used by the city of Stavanger for many years and has already proven itself in various projects. To ensure a smooth process and optimal installation, close cooperation with egeplast was relied upon.
Kine Homleid Johansen, Project Manager at the Municipality of Stavanger, values the high quality of training and services provided by egeplast: “The continuous exchange and close cooperation in all project phases give us a sense of security in our joint projects. We thank egeplast for the excellent collaboration and would work with them again at any time.”



egeplast
SLA® Barrier Pipe System
Permeation-resistant to protect drinking water and the environment
additive protective layer
certified barrier layer made of aluminum
Core pipe made of PE 100-RC
Learn moreProject description
Rehabilitation of the Main Water Supply
Challenges
Challenging ground conditions with remnants of walls and buildings
Solution
Flexible Solution: As Installation using the burstlining method could not be performed, the Open Trench Installation method was utilized.
Installation
Open Trench Installation
Pipe system
egeplast SLA® Barrier Pipe OD 560 mm, SDR 11, 708 m in 13.4 m lengths
Project participants
Client: Stavanger municipality, Burstlining Company: Steg Entreprenør AS, Construction Company: Nordbø Maskin AS