You can contact us
© Pfaffinger Bau SE
Your Contact
Heiner Dokters

Trenchless renewal of a drinking water pipeline in Nuremberg

The relining method ensures a future-proofed supply infrastructure

By rehabilitating the Lorenzer downpipe line, N-ERGIE Netz GmbH invested in the long-term security of Nuremberg’s drinking water supply. Over a length of around 1.7 km, an existing cast-iron pipeline DN 550 was renewed using an egeplast egelen® PE pipe system. The trenchless relining method made it possible to continue using the existing route. This method shortens construction times, reduces interventions in the traffic area, and conserves resources.

© Pfaffinger Bau SE
The rehabilitation of the Lorenzer downpipe line secures Nuremberg’s drinking water supply in the long term.

Renewal in an inner-city environment

The existing drinking water transmission pipeline runs through a densely built-up urban area, meaning that conventional replacement would have required extensive civil engineering work and would have significantly impacted traffic and local residents.

The aim of the project was therefore to renew the pipeline sustainably while minimising interventions in the existing infrastructure.

The new PE-HD pipe is pulled into the existing cast-iron pipeline using the relining method.
Positioning of the pipe string for the trenchless rehabilitation of the drinking water pipeline.
The pre-welded pipe string was laid out along the existing route for insertion.

Trenchless rehabilitation over around 1.7 km

An egeplast egelen® PE-HD pipe 500 × 45.5 mm was used for the rehabilitation. The entire pipeline was renewed in five construction sections using trenchless relining with the PE reduction method.

In this process, the new pipe’s outside diameter is reduced before insertion and then pulled into the existing cast-iron pipeline using a hydraulic cable winch system. After installation, the pipe returns to its original geometry and forms a new, permanently high-performance drinking water pipeline inside the old line. The existing route can continue to be used, while construction activity is limited to a few excavation pits.

The egeplast egelen® PE-HD pipes were delivered to the construction site in sections and prepared for installation.

Less civil engineering work, greater future-proofing

The trenchless construction method avoided extensive earthworks. At the same time, traffic areas, surface pavements, and existing infrastructure are subjected to significantly less strain than with complete replacement.

By using the egelen® pipe system, the network operator and the people of Nuremberg gained a modern drinking water pipeline designed to meet the requirements of a long-term secure supply.

© Pfaffinger Bau SE

Project Description

Rehabilitation of a drinking water transmission pipeline in Nuremberg

Challenges

Inner-city location, minimal interventions in existing infrastructure

Solution

Trenchless relining using the PE reduction method

Installation

1.7 km in five construction sections

Pipe System

egeplast egelen® PE-HD 500 × 45.5 mm

Project Participants

N-ERGIE Netz GmbH, Pfaffinger Bau SE from Passau in cooperation with the Berlin-Brandenburg branch

egeplast 3L Safety Pipe System Receives AwSV TÜV Certificate

Read more

egeGigaFab amazes visitors

Read more
Unlock All Downloads
Thank you for your interest! Please complete the fields to instantly access this and all future downloads from our site.