Notes on the transport, storage, and installation of fittings
Fittings and other components must be transported, handled, and stored with care and expertise. This ensures that their specified properties, which can be affected by environmental influences, are preserved at all times, and that material damage and deformation are avoided.

The storage area must be level and free of debris such as stones, nails, etc.

Fittings with heating coils in particular must be stored in their original packaging in enclosed spaces, protected from UV radiation and weather exposure. They must be stored in a frost-proof location at temperatures not exceeding 50°C.

The outer packaging and protective caps should only be removed immediately before installation.

When installing fittings, the applicable laying and welding guidelines for the pipe system used must be observed.

Fittings on pallets must not be stacked afterward, in order to prevent deformation.

Fittings must be installed free of stress and load.

Seamless bends must be protected from direct sunlight and stored in a cool location to prevent deviations from the specified angle.

Fittings stored outdoors must be protected from weather exposure using suitable means, such as fleece covering.

References & Project reports
Our systems have proven themselves in numerous projects over the decades. Read our project reports to see how our solutions make a real difference where it matters most: in on-site application.
3. April 2025

Time and cost savings through PreFab at the Leimen wastewater treatment plant

Through precisely fitting, pre-fabricated solutions, construction costs at the Leimen wastewater treatment plant could be significantly reduced. The pipeline contractor Tecoba mastered the challenges at the Leimen wastewater treatment plant, limiting assembly to the connection of the specially pre-fabricated modules from egeplast – thus realizing time and cost advantages.
Read more
21. February 2025

Environmentally compatible connection to the extra-high-voltage grid

Off the island of Baltrum, TenneT began connecting three offshore wind farms to the extra-high-voltage grid in summer 2024. The new 525 kV DC links of the 2 GW offshore grid connection projects BalWin3+4 and LanWin1 will strengthen the German power grid and increase the share of green electricity.
Read more
6. November 2018

Custom Component Distributes Rainwater for Europa-Park in Rust

A new water adventure resort will delight visitors to Europa-Park in Rust (Baden-Württemberg) from late 2019.
Read more

egeFit® Fittings Program

Use our egeFit® fittings program as a reference guide for your planning, tendering, and ordering. It contains all fittings along with their corresponding technical data and item numbers.
Download now!