In the heart of downtown Groningen, Netherlands, a cast iron drinking water pipeline from 1882 was renewed using the egeplast SLA® Barrier Pipe System via horizontal directional drilling. Due to the busy city center and difficult ground conditions, particularly precise and careful work was required.
Project Description
Renewal of the main water pipeline from 1882 in downtown Groningen
Challenges
- Undercrossing of the Reitdiep
- Possible soil contamination (foundations of the city wall, old pipelines and cables, explosive residues from World War II)
Solution
HDD drilling with egeplast SLA® Barrier Pipes
Pipe System
204 m SLA® Barrier Pipe, Dimension: 315 x 28.6 mm
Project Participants
| Client | Waterbedrijf Groningen |
| Project Location | Groningen, City Center (Netherlands) |
| Distribution Partner | Conval Nederland BV |
| General Contractor | BAM Infra BV |
| Implementation of Directional Drilling | Van Leeuwen Sleufloze Technieken BV |

Why did the main water pipeline need to be renewed?
The inverted siphon in downtown Groningen represents one of the city’s most important drinking water pipelines. It is located beneath the city wall of the Noorderhaven at the foot of the Reitdiep. Last year, during an inspection, the water utility of the province of Groningen discovered a hole in the nearly 140-year-old cast iron pipeline, which was caused by corrosion.
The solution for drinking water protection: egeplast SLA® Barrier Pipe


At a depth of 15 meters, the Groningen water utility renewed a total of 204 meters with the SLA® Barrier Pipe in OD 315 mm, SDR 11 for this project. The pipeline was installed beneath the Reitdiep canal using the HDD method within 1.5 hours. Through trenchless installation, the construction site could be kept relatively small in order not to disrupt the lively tourism in the beautiful city center of Groningen. “The installation at this depth as an undercrossing of the Reitdiep canal in the heart of Groningen presented us with a major challenge,” explains Johannes Zandstra from the installation company BAM Infra BV. “We had to keep an eye on the entire above-ground and underground infrastructure.” “For such an important main artery in our water network, which also guarantees a reliable supply of drinking water in the future, very good preparation, experienced partners, and first-class material on the construction site are required,” adds Dick van de Weerd from the utility Waterbedrijf Groningen.
Construction Site Video on the Renewal of the Drinking Water Pipeline in Groningen
You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More Informationegeplast
Barrier Pipe SLA®
Permeation-resistant to protect drinking water and the environment
additive protective layer
certified barrier layer made of aluminum
Core pipe made of PE 100-RC