
9010® RC pipe system
Your benefits at a glance
High operational safety through the use of point load-resistant materials
Reduction of civil engineering costs compared to sand bedding through reuse of the excavated soil
Resource conservation through reduced earth movements, elimination of the disposal of excavated material
Shorter construction times, lower emissions
100 years of service life


Technical data


Installation options for
9010® RC

In the sand bed

Without sand bedding

Milling Method


















