Norderney: BorWin5 Grid Connection
Transmission system operator TenneT is building a 900 MW grid connection from the EnBW He Dreiht wind farm to the converter station in Garrel/Ost. The 320 kV direct current connection strengthens the German supply network. TenneT is building this direct current grid connection with egeplast protective pipes for high and extra-high voltage cables up to…

Power Utility Expands Grid for Renewable Energies
Due to the positive development of the wind farm facilities in Fläming (Brandenburg), the existing grid infrastructure has been expanded since January 2017. A 110 kV cable connection now runs from the Petkus substation to the Schönewalde Süd grid connection point. For this, the grid operator uses the high-temperature resistant protective pipe ege-com® Macroduct High-T…