References about

Prague: Integrity Test after Crossing under the Vltava River
For the connection to the central wastewater treatment plant on the Vltava island of Císařský in Prague, a pipeline was installed under the Vltava using the HDD method. Tight bending radii made pipe installation difficult, and the geological conditions were unstable due to the slate rock.

SLM® DCS Enables Safe Transport of Treated Drinking Water in the Municipality of Aspach
To improve the drinking water supply, a transmission pipeline for treated drinking water was laid in Aspach – partly without sand bedding using open-cut construction, and partly using the trenchless drilling method.

Herausforderung Rohrlogistik
Eine reibungslose Logistik ist gerade für Bauunternehmen besonders wichtig.

Zukunft im Planungsbüro
Der Einsatz moderner Rohrsysteme wird oft durch das Wissen und die Erfahrung des planenden Büros bestimmt.