{"id":12421,"date":"2023-08-24T11:33:41","date_gmt":"2023-08-24T09:33:41","guid":{"rendered":"https:\/\/www.egeplast.de\/new-installation-technology-for-power-cable-installations-premiere-for-karosch-an-innovative-installation-sled-from-bohlen-doyen\/"},"modified":"2023-08-24T11:33:41","modified_gmt":"2023-08-24T09:33:41","slug":"new-installation-technology-for-power-cable-installations-premiere-for-karosch-an-innovative-installation-sled-from-bohlen-doyen","status":"publish","type":"post","link":"https:\/\/www.egeplast.de\/en\/new-installation-technology-for-power-cable-installations-premiere-for-karosch-an-innovative-installation-sled-from-bohlen-doyen\/","title":{"rendered":"New Installation technology for power cable Installations: Premiere for KaRoSch, an innovative Installation sled from Bohlen &amp; Doyen"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>In the Wahle-Mecklar pilot project of the project developer TenneT, Bohlen &amp; Doyen used the &#8220;KaRoSch&#8221; cable pipe sled for the underground cabling section, a new Installation technology for power cables, and thus achieved a significant increase in efficiency: an up to 25% higher Installation speed, increased occupational safety and a significant reduction in resource consumption.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"none","_seopress_titles_title":"","_seopress_titles_desc":"Stadtwerke Roth has begun the Installation of a new drinking water network pipeline to secure the supply in the long term.","_seopress_robots_index":"","_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[120,121,118],"tags":[125,123,124],"class_list":["post-12421","post","type-post","status-publish","format-standard","hentry","category-egenews","category-power-protect-pe","category-references","tag-cable-protection","tag-electricity","tag-power-protect-pe"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/posts\/12421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/comments?post=12421"}],"version-history":[{"count":0,"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/posts\/12421\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/media?parent=12421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/categories?post=12421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.egeplast.de\/en\/wp-json\/wp\/v2\/tags?post=12421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}