SLA® Barrier Pipe

Permeation-tight to protect potable water and the environment

The SLA® barrier pipe system reliably prevents the permeation of pollutants. The metallic permeation barrier enables permanent protection of sensitive media and the environment. In addition the electrical properties also provide the possibility of detecting the pipe and an integrity check after installation.

1
2
3
SLA® Barrier Pipe -
1

additional protective layer made from PE plus

2

additional protective layer made from PE plus

3

inner pipe made from PE 100-RC

Product features

  • Permeation-tight piping system, approved for installation in contaminated soils and soils susceptible to contamination (KIWA-certified)
  • Installation of potable water and wastewater systems possible in one single route with reduced installation clearance between them
  • The special additive protective layer ensures installation of the pressure pipe without any damages in trenchless pipe-laying.
  • Integrity testing of the piping system for acceptance of the construction work
  • Possibility of detection

At a glance

  • Medium: Potable water | wastewater | industrial media
  • Material: Core pipe, calibrated and signed, made of PE 100-RC, Protective layer made of modified Polyethylene PEplus
  • SDR: SDR 17,6 – SDR 7,4 (others by request)
  • Dimension: OD 25 – 1.600 mm
  • Approvals: DIN 8074/75; EN 12201; EN 1555; DVGW GW 335-A2; PAS 1075; KIWA BRL-K17101
  • Forms of delivery: Coil | Drum | Large drum by request | Straight lengths (6, 12 and 20 m) | Special lengths up to 30 m | Prefabrication | Telescoping for shipment in Containers
YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

Installation techniques

  • open trench installation without sandbed, ploughing and milling, open installation in sandbed
  • black-box installations such as horizontal directional drilling, burstlining, relining and soil displacement
  • laying of pipe bundles with wastewater and potable water in one single-out route
Rohrbündelverlegung mit Abwasser und Trinkwasser in einer Trasse

aying of pipe bundles with wastewater and potable water in one single-out route

Black-Box-Verlegung wie Spülbohrung, Berstlining, Relining und Bodenverdrängung

black-box installations such as horizontal directional drilling, burstlining, relining and soil displacement

offene Verlegung ohne Sandbett, Pflug-/ Fräsverfahren | offene Verlegung im Sandbett

open trench installation without sandbed, ploughing and milling, open installation in sandbed

Details

Project Amsterdam: A new drinking water pipe for a trendy neighbourhood in Amsterdam

Read more:

Project Gothenburg: Permanent protection of water supply line for Gothenburg

Read more:

Project Induss, Antwerp: Special application: demineralised process water

Read more:

Project Kopenhagen: Impermeable pipe system for cruise ship terminal and port area in Copenhagen

Read more:

Project Shell: Drinking water for Shell in the Port of Rotterdam

Read more:

Project Braubach: Guaranteeing the drinking water supply

Read more

Project Orangina Suntory: SLA® Barrier Pipe for an industrial mineral water filling line

Read more:

SLA® Barrier Pipe Brochure here:

SLA® Barrier Pipe Installation Guidelines here:

References SLA® here:

RFP form

SLA Barrier Pipe

T-pieces

Reduzierungen

reducers

seamless bends

mechanical couplings

egeplast offers complete piping systems: pipes for every application as well as harmonised components and solutions for special installation applications or functional requirements.

Contact us!

Construction site video
YouTube

By loading the video, you agree to YouTube's privacy policy.
Learn more

Load video

The original from egeplast in successful use for over 30 years

With the SLA® Barrier Pipe, egeplast has been supplying its customers with a safe and proven solution for transporting drinking water through contaminated soil for 30 years now. Using the appropriate connection technology, the multilayer pipe with integrated barrier layer can also ensure quick and easy installation as a complete system using the drilling flush method.